Parcel Number: 35204.0639 Data As Of: 10/22/2025
Site Address:    703 E 8TH AVE SCOUT Map

Owner
Owner Name: THORNLEY, ELI C
Address: 703 E 8TH AVE, SPOKANE, WA, 99202
Taxpayer
Taxpayer Name: THORNLEY, ELI C
Address: 507 W 5TH AVE, SPOKANE, WA, 99204-2656
Parcel TypeSite AddressCityLand SizeSize Desc.DescriptionTax YearTax Code AreaStatus
R703 E 8TH AVESPOKANE5400Square Feet11 Single Unit20250010Active
HIGHLAND PK HARTSONS TR F LT9 BLK5
Parcel ClassAppraiserNeighborhood CodeNeighborhood NameNeighborhood DescAppraiser NameAppraiser Phone
11 Single Unit159713552HARTS CITY-SC PTNS 20/29-25-4Chris(509) 477-5944

Under Washington State Law (WAC 458-07-015) The Assessor’s office is required to make an exterior observation of all properties at least once every six years. This property is scheduled for inspection between September 2027 and May of 2028.
Tax YearTaxableMarket TotalLandDwelling/StructureCurrent Use LandPersonal Prop.
2026362,800362,80095,000267,80000
2025352,200352,20072,900279,30000
2024353,400353,40064,800288,60000
2023338,500338,50040,500298,00000
2022256,870256,87031,370225,50000


Taxes are due April 30th and October 31st
Total Charges Owing: $1,748.06


Tax YearCharge TypeAnnual ChargesRemaining Charges Owing
Total Taxes for 2025 3,496.121,748.06
2025A/V Property Tax 3,484.311,742.16
2025Soil Conservation Principal CNSV1 10.015.00
2025Weed Control Principal WCWEED1 1.800.90
Total Taxes for 2024 3,425.550.00
2024A/V Property Tax 3,413.740.00
2024Soil Conservation Principal CNSV1 10.010.00
2024Weed Control Principal WCWEED1 1.800.00
Total Taxes for 2023 3,312.360.00
2023A/V Property Tax 3,300.550.00
2023Soil Conservation Principal CNSV1 10.010.00
2023Weed Control Principal WCWEED1 1.800.00
Total Taxes for 2022 3,006.990.00
2022A/V Property Tax 2,995.180.00
2022Soil Conservation Principal CNSV1 10.010.00
2022Weed Control Principal WCWEED1 1.800.00

Tax Receipts
Tax YearReceipt NumberReceipt DateReceipt Amount 
20251013296204/14/20251,748.06
2024996684710/29/20241,712.78
2024976415504/22/20241,712.77
2023956761010/24/20231,656.18
2023946876004/25/20231,656.18
2022924918610/24/20221,503.50
2022905906104/21/20221,503.49
Levy NameLevy Rate 2024Levy Rate 2025Levy TypeTax ID
County General 0.7027 0.7089 Non-Voted0010
County General Cons Futures 0.0256 0.0259 Non-Voted0010
SD081 Spokane B&I 1.5793 1.3429 Voted0010
SD081 Spokane General 2.2492 2.5000 Voted0010
Spokane Bond 0.0941 0.0939 Voted0010
Spokane Bond New 0.2087 0.2189 Voted0010
Spokane EMS 0.4946 0.4995 Non-Voted0010
Spokane General 1.9534 2.0068 Non-Voted0010
Spokane General Senior Lift 0.2006 0.2028 Non-Voted0010
State School 1.4010 1.4901 Non-Voted0010
State School Levy 2 0.7505 0.8031 Non-Voted0010
Totals:9.669.89  


Dwelling/ StructureYear BuiltGross Living AreaSizeTypeHouse TypeRoof MaterialHeatCoolBedroom*Half Bath*Full Bath*
Dwelling 19101,269NASF14 Vintage 1.5 story Comp sh medium Forced hot air-gas None 301
* - Room counts reflect above grade rooms only.

Residential Sq Ft BreakdownSq FtExtension
Basement705R01
1st Floor869R01
1.5400R01
Features / StructureMain Floor SizeSize Type
DWELL - OMP 189SF
DWELL - Upper Balcony 164SF
DWELL - Upper Roof Extension Canopy 189SF


Land NumberSoil IDFrontageDepthLot(s)
1R1SL 451201
Sale DateSale PriceSale InstrumentExcise NumberParcel
08/25/2014157,000.00Statutory Warranty Deed20141060135204.0639
08/28/198533,000.00NORMAL SALE 35204.0639
08/16/198529,000.00NORMAL SALE 35204.0639

Recorded Documents

To view recorded documents related to this parcel, please visit the Auditor’s Recorded Documents Portal

Permit NumberFiling DatePermit Description
B2008981MECH07/03/2020Installing Gas Insert - Installing Gas Insert
B2004466ELEC03/19/2020Thornley bathroom remodel - 2 altered circuits for bathroom remodel
B2004322BLDR03/17/2020Remodel Thornley Residence - Remodeling a bathroom. Changing the layout of existing bath, sink and shower are switching locations. Removing all lath and plaster.
B2004323PLMB03/17/2020Remodel Thornley Residence - Plumbing - Remodeling a bathroom. Changing the layout of existing bath, sink and shower are switching locations. Removing all lath and plaster.
B2004324MECH03/17/2020Remodel Thornley Residence - Mechanical - Remodeling a bathroom. Changing the layout of existing bath, sink and shower are switching locations. Removing all lath and plaster. Bath Fan
B1813463MECH08/28/2018INSTALL WATER HEATER - INSTALL GAS WATER HEATER IN BASEMENT

To view permits related to this parcel, please visit the:
Building Permits
Electrical Permits
Online Building Permits